PannErgy Plc hereby advises the actors of the capital markets that two of its subsidiaries, DD Energy Ltd and Arrabona Geothermal Ltd are closely following the targeted schedule of project realization concerning the implementation and completion of the Geothermal Project of Győr.
The Szentlőrinc Geothermal System consists of a production well and a reinjection well, pipelines connecting the wells with the heat centre, as well as the engineering, power and control engineering facilities in the latter.
MegnézemWith the investment, Berekfürdő Energy Ltd uses the methane accompanying gas originating from the thermal wells of Berekfürdő for the generation of electric power and heat, and then sells the produced energy.
MegnézemThe Miskolc Geothermal Project wins GeoPower Market’s international award: “Best Heating Project 2013”.
MegnézemThe system of Győr, commenced today, with full capacity is able to decrease the emission and so the quantity of the greenhouse gases – primarily carbon-dioxide, nitrogen-oxides – by approximately 67 000 tonnes on a yearly basis.
Megnézem